Engineer profile
Andrew
Gas Safe engineer · PK Plumbing
Andrew handles boiler repairs, heating faults and emergency plumbing across Tyne & Wear, Teesside and nearby towns.
Areas Andrew works in
DH7 · NE5 · Benton · Colinton · Crawcrook · Durham · Eston · Gateshead · Gilesgate · Gorgie · Houghton-le-Spring · Kingston Park
Common job types
- Leak repair
- Boiler Repairs
- Emergency Plumbing
- 24 Hour Plumbing
- Drain unblocking
- Toilet repair
- Bathroom Install
- Quote Customer requires installation of a new washing machine. Install washing machine and connect to existing services
Recent jobs by Andrew
-
Replace faulty taps and re seal bath area.
Durham · 4 Sept 2026
-
Shower screen faulty causing a leak, emergency plumber attended and resolved issue.
North Shields · 4 Sept 2026
-
Quote for a new shower to be installed. Shower needs to have a thermostatic control.
Stanley · 4 Sept 2026
-
Quote Customer requires installation of a new washing machine. Install washing machine and connect to existing services
Gateshead · 27 Aug 2026
-
Leak repair
Water leak traced and repaired near Neill Drive Sunniside in NE16 by Andrew after the rising main was weeping at the stop tap. Resolution: sealed and pressure-tested before reinstating the supply.
NE16 · 22 May 2026
-
Toilet repair
Cistern fault fixed in River View Bedlington (NE22) by Andrew after the pan was leaking from the soil connector. Resolution: fitted a new flush mechanism and tested.
River View Bedlington · 22 May 2026
-
Leak repair
Burst pipe isolated in Thorntree Gardens Ashington (NE63) after the rising main was weeping at the stop tap by Andrew. The work was isolated, the joint cut out and a new one made up in copper.
Thorntree Gardens Ashington · 19 May 2026
-
Toilet repair
Cistern fault fixed in Rowlands Gill1 Woodlands Road (NE39) by Andrew after the pan was leaking from the soil connector. Resolution: fitted a new flush mechanism and tested.
Rowlands Gill1 Woodlands Road · 18 May 2026
-
Leak repair
Water leak traced and repaired near Hilltop Road Bearpark in DH7 by Andrew after the rising main was weeping at the stop tap. Resolution: sealed and pressure-tested before reinstating the supply.
DH7 · 15 May 2026
-
Bathroom Install
New bathroom installed near Holly Cres Sacriston in DH7 after the basin and pedestal were being replaced like-for-like by Andrew. Resolution: fitted, tested and signed off with the customer.
DH7 · 14 May 2026
-
Drain unblocking
Kitchen waste cleared near Hylton Street in SR4 after wipes were found blocking the soil stack by Andrew. The work was rodded clear and flushed through with water.
SR4 · 12 May 2026
-
Leak repair
Burst pipe isolated near Lindfield Avenue Newcastle upon Tyne in NE5 after the rising main was weeping at the stop tap by Andrew. The work was isolated, the joint cut out and a new one made up in copper.
NE5 · 10 May 2026
Examples from our published recent-jobs feed — town names only, no customer details.